Vidyarthiplus (V+) - Indian Students Online Education Forum

Full Version: solution to this question
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
a.       List the main components of overhead lines.
b.      A pole for an overhead 11 kV, 3 phase, 50 Hz line is required to be earthed and a stay is to be provided
i.                Make a neat sketch of how this should be done
ii.              Prepare the list of materials required
ce2202 engineering of fiuids book